Home/ Boats/ Oyster/ Oyster 395 Lightwave/ Sails
Sail Specs & Dimensions

Oyster 395 Lightwave Sails

Sail dimensions, sail area, rig measurements and used sails for sale — Oyster 395 Lightwave (C. Schumacher design).

+ Add to Compare

Rigging Dimensions

The four foretriangle measurements sailmakers need to quote a new suit.

I ?
52.10 ft
J ?
15.30 ft
P ?
45.30 ft
E ?
14.70 ft

Sail Area Breakdown

Calculated from rigging dimensions. Use these as your starting point when ordering a new suit.

SailArea (ft²)Area (m²)
MainsailP × E ÷ 2 333.0 30.9
100% ForetriangleI × J ÷ 2 398.6 37.0
150% GenoaTypical light-air headsail 597.8 55.5
Storm Jib~50% of foretriangle, high-cut 199.3 18.5
Symmetric SpinnakerEstimated from I, J 1,434.8 133.3
Total Working Sail AreaMain + 100% foretriangle 731.5 68.0

Foretriangle Diagram

P 45.3′ E 14.7′ I 52.1′ J 15.3′ Main Foretriangle
Drawn to scale from published I, J, P, E measurements — Masthead Sloop · C. Schumacher design

Performance Ratios

How the Oyster 395 Lightwave carries its sail relative to its displacement.

SA/D Ratio
23.8
Performance-oriented — carries a lot of sail for its weight.
Mast Height (above DWL)
ft
Air draft not published — measure yours before any bridge transit.
Ballast Ratio
Ballast ratio not published.

Typical Sail Inventory

What Oyster 395 Lightwave owners usually carry and what's worth buying used vs. new.

Mainsail 333.0 ft²
Dacron cross-cut with 2 reef points is standard. Full-batten is a common upgrade.
Replace new
150% Genoa 597.8 ft²
The workhorse headsail. Most boats have one on a furler by now.
Replace new
110% Working Jib ~438 ft²
Good secondary sail for breezy days — used market is strong.
Buy used
Storm Jib 199.3 ft²
Bright orange recommended. Rarely used, hard to justify new.
Buy used
Asymmetric Spinnaker ~1,435 ft²
Popular downwind upgrade — easier than symmetric for shorthanded sailing.
Optional

Replacement Cost Estimator

Get a rough price range for a new mainsail and genoa for the Oyster 395 Lightwave — Dacron, laminate, and cruising performance tiers.

Estimate Cost →