Home/ Boats/ Goman/Express Yachting/ Express 30M Killing/ Sails
Sail Specs & Dimensions

Express 30M Killing Sails

Sail dimensions, sail area, rig measurements and used sails for sale — Express 30M Killing (Steve Killing design).

+ Add to Compare

Rigging Dimensions

The four foretriangle measurements sailmakers need to quote a new suit.

I ?
41.50 ft
J ?
12.00 ft
P ?
36.30 ft
E ?
12.00 ft

Sail Area Breakdown

Calculated from rigging dimensions. Use these as your starting point when ordering a new suit.

SailArea (ft²)Area (m²)
MainsailP × E ÷ 2 217.8 20.2
100% ForetriangleI × J ÷ 2 249.0 23.1
150% GenoaTypical light-air headsail 373.5 34.7
Storm Jib~50% of foretriangle, high-cut 124.5 11.6
Symmetric SpinnakerEstimated from I, J 896.4 83.3
Total Working Sail AreaMain + 100% foretriangle 466.8 43.4

Foretriangle Diagram

P 36.3′ E 12.0′ I 41.5′ J 12.0′ Main Foretriangle
Drawn to scale from published I, J, P, E measurements — Masthead Sloop · Steve Killing design

Performance Ratios

How the Express 30M Killing carries its sail relative to its displacement.

SA/D Ratio
22.2
Performance-oriented — carries a lot of sail for its weight.
Mast Height (above DWL)
ft
Air draft not published — measure yours before any bridge transit.
Ballast Ratio
Ballast ratio not published.

Typical Sail Inventory

What Express 30M Killing owners usually carry and what's worth buying used vs. new.

Mainsail 217.8 ft²
Dacron cross-cut with 2 reef points is standard. Full-batten is a common upgrade.
Replace new
150% Genoa 373.5 ft²
The workhorse headsail. Most boats have one on a furler by now.
Replace new
110% Working Jib ~274 ft²
Good secondary sail for breezy days — used market is strong.
Buy used
Storm Jib 124.5 ft²
Bright orange recommended. Rarely used, hard to justify new.
Buy used
Asymmetric Spinnaker ~896 ft²
Popular downwind upgrade — easier than symmetric for shorthanded sailing.
Optional

Replacement Cost Estimator

Get a rough price range for a new mainsail and genoa for the Express 30M Killing — Dacron, laminate, and cruising performance tiers.

Estimate Cost →