Home/ Boats/ Macgregor Yachts Inc. (Usa)/ Macgregor 26X/ Sails
Sail Specifications

Macgregor 26X Sails

Rigging dimensions, sail areas, and replacement sail reference for the Macgregor 26X (Roger Macgregor design).

+ Add to Compare

Rigging Dimensions

The four foretriangle measurements sailmakers need to quote a new suit.

I ?
23.00 ft
J ?
9.67 ft
P ?
25.00 ft
E ?
10.38 ft

Sail Area Breakdown

Calculated from rigging dimensions. Use these as your starting point when ordering a new suit.

SailArea (ft²)Area (m²)
MainsailP × E ÷ 2 129.8 12.1
100% ForetriangleI × J ÷ 2 111.2 10.3
150% GenoaTypical light-air headsail 166.8 15.5
Storm Jib~50% of foretriangle, high-cut 55.6 5.2
Symmetric SpinnakerEstimated from I, J 400.3 37.2
Total Working Sail AreaMain + 100% foretriangle 241.0 22.4

Foretriangle Diagram

P 25.0′ E 10.4′ I 23.0′ J 9.7′ Main Foretriangle
Drawn to scale from published I, J, P, E measurements — Fractional Sloop · Roger Macgregor design

Performance Ratios

How the Macgregor 26X carries its sail relative to its displacement.

SA/D Ratio
18.7
Powerful cruiser/racer — quick in light air, reef early in a blow.
Mast Height (above DWL)
ft
Air draft not published — measure yours before any bridge transit.
Ballast Ratio
37%
Typical cruising ballast — balanced stability underway.

Typical Sail Inventory

What Macgregor 26X owners usually carry and what's worth buying used vs. new.

Mainsail 129.8 ft²
Dacron cross-cut with 2 reef points is standard. Full-batten is a common upgrade.
Replace new
150% Genoa 166.8 ft²
The workhorse headsail. Most boats have one on a furler by now.
Replace new
110% Working Jib ~122 ft²
Good secondary sail for breezy days — used market is strong.
Buy used
Storm Jib 55.6 ft²
Bright orange recommended. Rarely used, hard to justify new.
Buy used
Asymmetric Spinnaker ~400 ft²
Popular downwind upgrade — easier than symmetric for shorthanded sailing.
Optional

Replacement Cost Estimator

Get a rough price range for a new mainsail and genoa for the Macgregor 26X — Dacron, laminate, and cruising performance tiers.

Estimate Cost →