Home/ Boats/ Lancer Yacht Corp. (Usa)/ Lancer 36 Fr/ Sails
Sail Specifications

Lancer 36 Fr Sails

Rigging dimensions, sail areas, and replacement sail reference for the Lancer 36 Fr (Bill Lee design).

+ Add to Compare

Rigging Dimensions

The four foretriangle measurements sailmakers need to quote a new suit.

I ?
42.20 ft
J ?
13.70 ft
P ?
45.30 ft
E ?
16.30 ft

Sail Area Breakdown

Calculated from rigging dimensions. Use these as your starting point when ordering a new suit.

SailArea (ft²)Area (m²)
MainsailP × E ÷ 2 369.2 34.3
100% ForetriangleI × J ÷ 2 289.1 26.9
150% GenoaTypical light-air headsail 433.6 40.3
Storm Jib~50% of foretriangle, high-cut 144.5 13.4
Symmetric SpinnakerEstimated from I, J 1,040.7 96.7
Total Working Sail AreaMain + 100% foretriangle 658.3 61.2

Foretriangle Diagram

P 45.3′ E 16.3′ I 42.2′ J 13.7′ Main Foretriangle
Drawn to scale from published I, J, P, E measurements — Fractional Sloop · Bill Lee design

Performance Ratios

How the Lancer 36 Fr carries its sail relative to its displacement.

SA/D Ratio
22.0
Performance-oriented — carries a lot of sail for its weight.
Mast Height (above DWL)
ft
Air draft not published — measure yours before any bridge transit.
Ballast Ratio
38%
Stiff enough to carry a 150% genoa comfortably into moderate breeze.

Typical Sail Inventory

What Lancer 36 Fr owners usually carry and what's worth buying used vs. new.

Mainsail 369.2 ft²
Dacron cross-cut with 2 reef points is standard. Full-batten is a common upgrade.
Replace new
150% Genoa 433.6 ft²
The workhorse headsail. Most boats have one on a furler by now.
Replace new
110% Working Jib ~318 ft²
Good secondary sail for breezy days — used market is strong.
Buy used
Storm Jib 144.5 ft²
Bright orange recommended. Rarely used, hard to justify new.
Buy used
Asymmetric Spinnaker ~1,041 ft²
Popular downwind upgrade — easier than symmetric for shorthanded sailing.
Optional

Replacement Cost Estimator

Get a rough price range for a new mainsail and genoa for the Lancer 36 Fr — Dacron, laminate, and cruising performance tiers.

Estimate Cost →