Home/ Boats/ Harmony Yachts/Gloucester Yachts (Usa)/ Harmony 22/ Sails
Sail Specifications

Harmony 22 Sails

Rigging dimensions, sail areas, and replacement sail reference for the Harmony 22 (Chris Bjerregaard design).

+ Add to Compare

Rigging Dimensions

The four foretriangle measurements sailmakers need to quote a new suit.

I ?
0.90 ft
J ?
7.80 ft
P ?
248.00 ft
E ?
180.62 ft

Sail Area Breakdown

Calculated from rigging dimensions. Use these as your starting point when ordering a new suit.

SailArea (ft²)Area (m²)
MainsailP × E ÷ 2 22,396.9 2,080.7
100% ForetriangleI × J ÷ 2 3.5 0.3
150% GenoaTypical light-air headsail 5.3 0.5
Storm Jib~50% of foretriangle, high-cut 1.8 0.2
Symmetric SpinnakerEstimated from I, J 12.6 1.2
Total Working Sail AreaMain + 100% foretriangle 22,400.4 2,081.1

Foretriangle Diagram

P 248.0′ E 180.6′ I 0.9′ J 7.8′ Main Foretriangle
Drawn to scale from published I, J, P, E measurements — Fractional Sloop · Chris Bjerregaard design

Performance Ratios

How the Harmony 22 carries its sail relative to its displacement.

SA/D Ratio
19.1
Powerful cruiser/racer — quick in light air, reef early in a blow.
Mast Height (above DWL)
ft
Air draft not published — measure yours before any bridge transit.
Ballast Ratio
37%
Typical cruising ballast — balanced stability underway.

Typical Sail Inventory

What Harmony 22 owners usually carry and what's worth buying used vs. new.

Mainsail 22,396.9 ft²
Dacron cross-cut with 2 reef points is standard. Full-batten is a common upgrade.
Replace new
150% Genoa 5.3 ft²
The workhorse headsail. Most boats have one on a furler by now.
Replace new
110% Working Jib ~4 ft²
Good secondary sail for breezy days — used market is strong.
Buy used
Storm Jib 1.8 ft²
Bright orange recommended. Rarely used, hard to justify new.
Buy used
Asymmetric Spinnaker ~13 ft²
Popular downwind upgrade — easier than symmetric for shorthanded sailing.
Optional

Replacement Cost Estimator

Get a rough price range for a new mainsail and genoa for the Harmony 22 — Dacron, laminate, and cruising performance tiers.

Estimate Cost →