Home/ Boats/ Soverel Marine (Usa)/ Soverel 39/ Sails
Sail Specifications

Soverel 39 Sails

Rigging dimensions, sail areas, and replacement sail reference for the Soverel 39 (Mark Soverel design).

+ Add to Compare

Rigging Dimensions

The four foretriangle measurements sailmakers need to quote a new suit.

I ?
51.00 ft
J ?
14.75 ft
P ?
49.00 ft
E ?
15.00 ft

Sail Area Breakdown

Calculated from rigging dimensions. Use these as your starting point when ordering a new suit.

SailArea (ft²)Area (m²)
MainsailP × E ÷ 2 367.5 34.1
100% ForetriangleI × J ÷ 2 376.1 34.9
150% GenoaTypical light-air headsail 564.2 52.4
Storm Jib~50% of foretriangle, high-cut 188.1 17.5
Symmetric SpinnakerEstimated from I, J 1,354.1 125.8
Total Working Sail AreaMain + 100% foretriangle 743.6 69.1

Foretriangle Diagram

P 49.0′ E 15.0′ I 51.0′ J 14.8′ Main Foretriangle
Drawn to scale from published I, J, P, E measurements — Fractional Sloop · Mark Soverel design

Performance Ratios

How the Soverel 39 carries its sail relative to its displacement.

SA/D Ratio
23.6
Performance-oriented — carries a lot of sail for its weight.
Mast Height (above DWL)
ft
Air draft not published — measure yours before any bridge transit.
Ballast Ratio
55%
Race-oriented ballast ratio — stiff and powerful.

Typical Sail Inventory

What Soverel 39 owners usually carry and what's worth buying used vs. new.

Mainsail 367.5 ft²
Dacron cross-cut with 2 reef points is standard. Full-batten is a common upgrade.
Replace new
150% Genoa 564.2 ft²
The workhorse headsail. Most boats have one on a furler by now.
Replace new
110% Working Jib ~414 ft²
Good secondary sail for breezy days — used market is strong.
Buy used
Storm Jib 188.1 ft²
Bright orange recommended. Rarely used, hard to justify new.
Buy used
Asymmetric Spinnaker ~1,354 ft²
Popular downwind upgrade — easier than symmetric for shorthanded sailing.
Optional

Replacement Cost Estimator

Get a rough price range for a new mainsail and genoa for the Soverel 39 — Dacron, laminate, and cruising performance tiers.

Estimate Cost →