Home/ Boats/ Baltic Yachts/ Baltic 64/ Sails
Sail Specifications

Baltic 64 Sails

Rigging dimensions, sail areas, and replacement sail reference for the Baltic 64 (Sparkman & Stephens design).

+ Add to Compare

Rigging Dimensions

The four foretriangle measurements sailmakers need to quote a new suit.

I ?
83.00 ft
J ?
24.00 ft
P ?
75.00 ft
E ?
22.00 ft

Sail Area Breakdown

Calculated from rigging dimensions. Use these as your starting point when ordering a new suit.

SailArea (ft²)Area (m²)
MainsailP × E ÷ 2 825.0 76.6
100% ForetriangleI × J ÷ 2 996.0 92.5
150% GenoaTypical light-air headsail 1,494.0 138.8
Storm Jib~50% of foretriangle, high-cut 498.0 46.3
Symmetric SpinnakerEstimated from I, J 3,585.6 333.1
Total Working Sail AreaMain + 100% foretriangle 1,821.0 169.2

Foretriangle Diagram

P 75.0′ E 22.0′ I 83.0′ J 24.0′ Main Foretriangle
Drawn to scale from published I, J, P, E measurements — Masthead Sloop · Sparkman & Stephens design

Performance Ratios

How the Baltic 64 carries its sail relative to its displacement.

SA/D Ratio
19.9
Powerful cruiser/racer — quick in light air, reef early in a blow.
Mast Height (above DWL)
ft
Air draft not published — measure yours before any bridge transit.
Ballast Ratio
44%
Stiff enough to carry a 150% genoa comfortably into moderate breeze.

Typical Sail Inventory

What Baltic 64 owners usually carry and what's worth buying used vs. new.

Mainsail 825.0 ft²
Dacron cross-cut with 2 reef points is standard. Full-batten is a common upgrade.
Replace new
150% Genoa 1,494.0 ft²
The workhorse headsail. Most boats have one on a furler by now.
Replace new
110% Working Jib ~1,096 ft²
Good secondary sail for breezy days — used market is strong.
Buy used
Storm Jib 498.0 ft²
Bright orange recommended. Rarely used, hard to justify new.
Buy used
Asymmetric Spinnaker ~3,586 ft²
Popular downwind upgrade — easier than symmetric for shorthanded sailing.
Optional

Replacement Cost Estimator

Get a rough price range for a new mainsail and genoa for the Baltic 64 — Dacron, laminate, and cruising performance tiers.

Estimate Cost →