Home/ Boats/ Ouyang Boat Works (Can)/ Aloha 85/ Sails
Sail Specifications

Aloha 85 Sails

Rigging dimensions, sail areas, and replacement sail reference for the Aloha 85 (Ted Brewer/Robert Walstrom design).

+ Add to Compare

Rigging Dimensions

The four foretriangle measurements sailmakers need to quote a new suit.

I ?
37.00 ft
J ?
12.25 ft
P ?
32.00 ft
E ?
10.50 ft

Sail Area Breakdown

Calculated from rigging dimensions. Use these as your starting point when ordering a new suit.

SailArea (ft²)Area (m²)
MainsailP × E ÷ 2 168.0 15.6
100% ForetriangleI × J ÷ 2 226.6 21.1
150% GenoaTypical light-air headsail 339.9 31.6
Storm Jib~50% of foretriangle, high-cut 113.3 10.5
Symmetric SpinnakerEstimated from I, J 815.9 75.8
Total Working Sail AreaMain + 100% foretriangle 394.6 36.7

Foretriangle Diagram

P 32.0′ E 10.5′ I 37.0′ J 12.3′ Main Foretriangle
Drawn to scale from published I, J, P, E measurements — Masthead Sloop · Ted Brewer/Robert Walstrom design

Performance Ratios

How the Aloha 85 carries its sail relative to its displacement.

SA/D Ratio
17.8
Moderate — comfortable coastal cruiser, not overcanvassed.
Mast Height (above DWL)
ft
Air draft not published — measure yours before any bridge transit.
Ballast Ratio
41%
Stiff enough to carry a 150% genoa comfortably into moderate breeze.

Typical Sail Inventory

What Aloha 85 owners usually carry and what's worth buying used vs. new.

Mainsail 168.0 ft²
Dacron cross-cut with 2 reef points is standard. Full-batten is a common upgrade.
Replace new
150% Genoa 339.9 ft²
The workhorse headsail. Most boats have one on a furler by now.
Replace new
110% Working Jib ~249 ft²
Good secondary sail for breezy days — used market is strong.
Buy used
Storm Jib 113.3 ft²
Bright orange recommended. Rarely used, hard to justify new.
Buy used
Asymmetric Spinnaker ~816 ft²
Popular downwind upgrade — easier than symmetric for shorthanded sailing.
Optional

Replacement Cost Estimator

Get a rough price range for a new mainsail and genoa for the Aloha 85 — Dacron, laminate, and cruising performance tiers.

Estimate Cost →