Home/ Boats/ Alden Yachts (Usa)/ Alden 44 Mii/ Sails
Sail Specifications

Alden 44 Mii Sails

Rigging dimensions, sail areas, and replacement sail reference for the Alden 44 Mii (Alden Associates design).

+ Add to Compare

Rigging Dimensions

The four foretriangle measurements sailmakers need to quote a new suit.

I ?
54.10 ft
J ?
19.30 ft
P ?
47.10 ft
E ?
14.80 ft

Sail Area Breakdown

Calculated from rigging dimensions. Use these as your starting point when ordering a new suit.

SailArea (ft²)Area (m²)
MainsailP × E ÷ 2 348.5 32.4
100% ForetriangleI × J ÷ 2 522.1 48.5
150% GenoaTypical light-air headsail 783.1 72.8
Storm Jib~50% of foretriangle, high-cut 261.0 24.3
Symmetric SpinnakerEstimated from I, J 1,879.4 174.6
Total Working Sail AreaMain + 100% foretriangle 870.6 80.9

Foretriangle Diagram

P 47.1′ E 14.8′ I 54.1′ J 19.3′ Main Foretriangle
Drawn to scale from published I, J, P, E measurements — Masthead Sloop · Alden Associates design

Performance Ratios

How the Alden 44 Mii carries its sail relative to its displacement.

SA/D Ratio
16.6
Moderate — comfortable coastal cruiser, not overcanvassed.
Mast Height (above DWL)
ft
Air draft not published — measure yours before any bridge transit.
Ballast Ratio
41%
Stiff enough to carry a 150% genoa comfortably into moderate breeze.

Typical Sail Inventory

What Alden 44 Mii owners usually carry and what's worth buying used vs. new.

Mainsail 348.5 ft²
Dacron cross-cut with 2 reef points is standard. Full-batten is a common upgrade.
Replace new
150% Genoa 783.1 ft²
The workhorse headsail. Most boats have one on a furler by now.
Replace new
110% Working Jib ~574 ft²
Good secondary sail for breezy days — used market is strong.
Buy used
Storm Jib 261.0 ft²
Bright orange recommended. Rarely used, hard to justify new.
Buy used
Asymmetric Spinnaker ~1,879 ft²
Popular downwind upgrade — easier than symmetric for shorthanded sailing.
Optional

Replacement Cost Estimator

Get a rough price range for a new mainsail and genoa for the Alden 44 Mii — Dacron, laminate, and cruising performance tiers.

Estimate Cost →